Area 1 & 2 - Contract 1- LaTour Construction, Inc

Inspector: Richard Hjelle (651) 775-5112                Construction Hotline:  (651) 967-4501

·         Construction for the day

-        Latour is working on installing sanitary sewer on 134 Ave .  They should complete the sanitary installation today.

-        They also have a utility crew working on storm sewer on 134th ½ Ave.

-        North Pine will work to grade the ditches South Diamond Lake Road from Balsam Lane to Evergreen Lane.

-        North Pine will also remove the millings on Zachary Circle and French Lake road to prepare it for Asphalt.

.

Area 3, 4 & 6 – Contract 2 – S.R. Weidema       

Inspector: Katie Kirchner (651) 755-3405                Construction Hotline: (651) 967-4512

·         Construction for the day

-        Weidema will have a utility crew working installing sanitary sewer on North Diamond Lake Road working to the west from Vinewood Lane towards Berkshire Lane.

-        Another utility crew will work on repairing a water service on Vinewood Lane. They will then move to north of the intersection of 139th Ave. and work on some storm sewer. After that they will move to work on the water main in the west boulevard on Pineview Lane heading towards the tower.

-        The road crew will work on preparing driveways for concrete and asphalt on South Diamond Lake Road, Vinewood Lane, and 139th Ave.

-        They will also be installing the property owner’s fence along the sanitary easement to the east of Norwood Lane.

-        McCrossan will be paving the wear course on the patch on Pineview Lane and Norwood Lane. They will also put the wear course on the trail that is north of City Hall.

 

Area 5 – Contract 3 – Kuechle Underground

Inspector: Lance Meyer (651)783-6582                  Construction Hotline: (651)967-4523

·         Construction for the day  

-        Kuechle will be raising manholes castings on all of the paved streets.

-        Kuechle will also be saw cutting and removing damaged driveway sections on the newly curbed streets.

-        Creative Curb will be finishing the last remaining sections of missing curb.

-        Fehn will be backfilling the newly poured curb and grading the gravel streets.

 

General

·         The schedule above is an estimate for the day. The weather can delay the schedule or cause it to change.

·         Please do not hesitate to contact the inspectors if you have any questions about each project. Paul Perez is also available to answer any questions or listen to concerns at (651) 324-5585.