Area 1 & 2 - Contract 1- LaTour Construction, Inc
Inspector: Richard Hjelle (651) 775-5112 Construction Hotline: (651) 967-4501
·
Construction for the
day
-
North Pine will
be grading the sand on
-
Latour will have
on utility crew installing trunk sanitary sewer in the easement area towards
-
There will also
be a utility crew installing storm sewer to the City pond on the south side of
-
Once the storm
sewer is installed the utility crew will install services on
.
Area 3, 4 & 6 – Contract 2 – S.R. Weidema
Inspector: Katie Kirchner (651) 755-3405 Construction Hotline: (651) 967-4512
·
Construction for
the day
-
S. R Weidema will
have a utility crew installing water main on South Diamond Lake Road between Vinewood
Lane and the west end of the project.
-
They will also
have a utility crew installing water main at the intersection of
-
They will also
have a crew on
-
The road crew
will start cutting out the road on
-
There will also
be a crew working on preparing the driveways on Noon Drive and
-
There will also
be a crew working on removing driveways and cleaning up driveway access on
-
Residents on
-
Residents on
Area 5 – Contract
3 – Kuechle Underground
Inspector: Lance Meyer (651)783-6582 Construction
Hotline: (651)967-4523
·
Construction for the day
-
Kuechle will be
installing concrete driveways on the streets where the curb and gutter has been
installed.
-
These streets
will also be prepared for seeding. The seed will be installed later this week.
-
Mail box
installation will continue on these streets.
-
On the streets
where curb and gutter is not installed, Kuechle will be preparing them for curb
and gutter installation. This will be dependent on the weather.
General
·
The schedule
above is an estimate for the day. The weather can delay the schedule or cause
it to change.
·
Please do not
hesitate to contact the inspectors if you have any questions about each project.
Paul Perez is also available to answer any questions or listen to concerns at